Facilities Design

Designing a flexible assembly line for concealed cistern production

In the context of this project, the project team is expected to analyze the assembly operations of a product (concealed cistern), and develop alternative balanced assembly line designs that can satisfy the desired production rate expectations. Three different variants of the product is expected to be assembled on this line. The problem owner’s primary objective is to achieve a smoother production rate with minimal idle time on the assembly line.

Subscribe to RSS - Facilities Design